BILL ANALYSIS ------------------------------------------------------------ |SENATE RULES COMMITTEE | SB 110| |Office of Senate Floor Analyses | | |1020 N Street, Suite 524 | | |(916) 445-6614 Fax: (916) | | |327-4478 | | ------------------------------------------------------------ UNFINISHED BUSINESS Bill No: SB 110 Author: Peace (D) Amended: 8/26/99 Vote: 21 SENATE ENERGY, U.&C. COMMITTEE : 8-0, 4/13/99 AYES: Bowen, Baca, Brulte, Kelley, Mountjoy, Peace, Solis, Speier NOT VOTING: Alarcon, Hughes, Vasconcellos SENATE APPROPRIATIONS COMMITTEE : 13-0, 5/10/99 AYES: Johnston, Alpert, Bowen, Burton, Escutia, Johnson, Karnette, Kelley, Leslie, McPherson, Mountjoy, Perata, Vasconcellos SENATE FLOOR : 39-0, 5/17/99 AYES: Alarcon, Alpert, Baca, Bowen, Brulte, Burton, Chesbro, Dunn, Escutia, Figueroa, Hayden, Haynes, Hughes, Johannessen, Johnson, Johnston, Karnette, Kelley, Knight, Leslie, Lewis, McPherson, Monteith, Morrow, Mountjoy, Murray, O'Connell, Ortiz, Peace, Perata, Polanco, Poochigian, Rainey, Schiff, Sher, Solis, Speier, Vasconcellos, Wright NOT VOTING: Costa ASSEMBLY FLOOR : 77-0, 9/8/99 (Passed on Consent) - See last page for vote SUBJECT : Energy conservation: power facility and site certification SOURCE : Author CONTINUED SB 110 Page 2 DIGEST : This bill amends the California Energy Commission's powerplant siting process to eliminate the "integrated assessment of need" requirement and expand the exemption of natural gas powerplants from the site evaluation process. The bill also requires CEC to provide reports to the Governor and the Legislature concerning improvements to the power plant siting process, data collection in the restructured electricity market and environmental performance of electric generation facilities. Assembly Amendments (a) add the report requirements, and (b) make technical, clarifying changes. ANALYSIS : The Warren-Alquist Act established an exclusive process for siting of thermal powerplants 50 megawatts and larger that was intended to guard against overbuilding of powerplants and provide comprehensive environmental review and predictable, one-stop permitting of applications. The Act requires the California Energy Commission (CEC) to develop long-term forecasts of state energy needs, which serve as a basis for planning and certification of individual powerplant facilities. The Act grants the CEC exclusive authority to certify powerplants and authorizes the CEC to override other state, local or regional decisions and certify a powerplant it determines is required for "public convenience and necessity." The first step in the siting process is the requirement that an applicant file a notice of intention (NOI), which is intended to provide alternative sites for the CEC to evaluate. An NOI describes the location, design and operation of the preferred site and alternative sites. The CEC evaluates the sites based on environmental impact, connection to grid, need and compatibility with the existing system. The NOI process also includes specific requirements for CEC consultation with other federal, state, regional and local agencies, including detailed analysis and comment SB 110 Page 3 requirements for the California Coastal Commission and the San Francisco Bay Conservation and Development Commission for sites proposed to be located within their jurisdictions. The law generally requires that at least two alternative sites be identified prior to moving to the next step in the siting process, the application for certification (AFC). However, since the siting process was established in 1975, a number of statutory exemptions to the NOI requirement have been established. Current statutorily exempt projects include modifications to existing facilities, demonstration projects, site-specific facilities like geothermal powerplants, and natural gas powerplants that result from competitive solicitation or negotiation. The CEC has interpreted the natural gas powerplant exemption to apply to any natural gas powerplant that intends to sell its product into the Power Exchange. As a result, all recent applications submitted to the CEC have been granted an exemption from the NOI process. This bill codifies the CEC's practice by expanding the existing exemption to include all natural gas powerplants, regardless of their competitive status. This assumes that all future applicants would sell their products into the competitive market and would make the CEC exemption determination a "no-brainer," thereby easing the burden on applicants filing for exemptions. The rationale for allowing a blanket exemption for natural gas powerplants is that, in a competitive market, the NOI function of identifying an acceptable site is the obligation of the applicant, not the CEC. The more substantive next step in the siting process is consideration of the AFC, which is a CEQA-equivalent project evaluation process. In approving an AFC, the CEC must find that the facility's construction and operation is consistent with a variety of environmental standards and that the facility conforms with the CEC's integrated assessment of need (IAN). The IAN is determined through the development of the CEC's Electricity Report, which is a comprehensive planning and SB 110 Page 4 forecasting assessment addressing the supply and demand for electricity. According to the CEC, in response to restructuring, the most recent IAN stated that any proposed project is found to be needed if the total number of megawatts does not exceed a numerical cap that the CEC determined could be needed to satisfy statewide peak demand and maintain system reliability (6737 MW). Because this cap is sufficiently high that it is not likely to be exceeded, as a practical matter, the current IAN will have no effect on individual facility certification. This bill eliminates the IAN and contingent siting considerations. Again, the rationale is that, in a competitive market, the determination of whether a facility is needed is the obligation of the applicant, not the CEC. Theoretically, market consequences will discourage applicants from building facilities that aren't needed. This bill requires the California Energy Commission (CEC) to prepare and submit the following reports: 1. By April 2000, recommendations to improve the application and certification process for siting power plants. 2. By April 2000, recommendations to consolidate and clarify existing reporting requirements regarding electric utility generating loads and emerging trends in energy supply and demand. 3. By April 2000, a workplan for completing a subsequent report by July 2001. 4. By July 23001 and every two years thereafter, an assessment of the environmental performance of the state's electric generation facilities. FISCAL EFFECT : Appropriation: No Fiscal Com.: Yes Local: No SUPPORT : (Verified 5/12/99) (Unable to reverify at time of writing) SB 110 Page 5 California League of Food Processors California Municipal Utilities Association Independent Energy Producers Sempra Energy ASSEMBLY FLOOR : 77-0, 9/8/99 AYES: Aanestad, Ackerman, Alquist, Aroner, Ashburn, Baldwin, Bates, Battin, Baugh, Bock, Brewer, Briggs, Calderon, Campbell, Cardenas, Cardoza, Cedillo, Corbett, Correa, Cox, Cunneen, Davis, Dickerson, Ducheny, Dutra, Firebaugh, Florez, Floyd, Gallegos, Granlund, Havice, Hertzberg, Honda, House, Jackson, Keeley, Knox, Kuehl, Leach, Lempert, Leonard, Longville, Lowenthal, Machado, Maddox, Maldonado, Margett, Mazzoni, McClintock, Migden, Nakano, Olberg, Oller, Robert Pacheco, Rod Pacheco, Papan, Pescetti, Reyes, Romero, Runner, Scott, Shelley, Soto, Steinberg, Strickland, Strom-Martin, Thompson, Thomson, Torlakson, Vincent, Washington, Wayne, Wiggins, Wildman, Wright, Zettel, Villaraigosa NOT VOTING: Frusetta, Kaloogian, Wesson NC:cm 9/8/99 Senate Floor Analyses SUPPORT/OPPOSITION: SEE ABOVE **** END ****