BILL ANALYSIS                                                                                                                                                                                                    



                                                                  AB 1348
                                                                  Page  1

          Date of Hearing:   April 25, 2005

                    ASSEMBLY COMMITTEE ON UTILITIES AND COMMERCE
                               Lloyd E. Levine, Chair
                    AB 1348 (Runner) - As Amended:  April 19, 2005
           
          SUBJECT  :   Antelope Valley Fairgrounds EE and PV Synergy  
          Demonstration Project.

           SUMMARY  :    Creates the Antelope Valley Fairgrounds Energy  
          Efficiency (EE) and photovoltaic (PV) Synergy Demonstration  
          Project (project), which would be used to evaluate synergies  
          between energy efficiency and solar technologies.  Specifically,  
           this bill  :  

          Requires that the California Public Utilities Commission (PUC)  
          to establish a project that would require:

               a)     The calibration of energy management systems, the  
                 installation of variable speed drives on exhaust fans,  
                 the relocation of compressor-condenser units, the  
                 installation of occupancy sensors for lighting controls  
                 and the installation of cost effective energy efficient  
                 equipment in future expansions of Antelope Valley fair  
                 facilities. 

               b)      The installation of an onsite 630kW photovoltaic  
                 (PV) solar system on the fair grounds. 

               c)     The establishment of incentive rates that provide  
                 rate stability and certainty over a 10-yar period in an  
                 amount that would support investment in and test the  
                 durability of the PV system. 

               d)     An annual audit conducted by the electrical  
                 corporation providing electrical service of the  
                 demonstration project. 

           FISCAL EFFECT  :   Unknown.

           COMMENTS  :   According to the author the purpose of this bill is  
          to create a demonstration project that would allow the Antelope  
          Valley Fairgrounds to install new energy efficiency systems and  
          a new PV energy system under a specially designed tariff that  
          will allow the fairgrounds to recoup the costs of the solar  








                                                                  AB 1348
                                                                  Page  2

          energy system. The demonstration project will be used to test  
          the durability of the systems and the effectiveness of combining  
          large PV systems with modern energy efficiency technologies. 

          1)  Cost Shifts  : The specially designed tariff that will allow  
          the Antelope Valley Fairgrounds to install the PV energy system  
          likely will allow the fairgrounds to avoid paying charges  
          related to the utility's fixed costs for maintaining the  
          transmission and distribution system and for maintaining  
          adequate reserves. Since the utility will still be allowed to  
          recover these costs there is a risk that this bill could result  
          in a cost shift from the fairgrounds to other customers. While  
          the cost shift may be small, in order to assure that this bill  
          does ultimately lead to costs shifts from to other customer  
          classes,  the committee may wish to consider amending the bill to  
          provide that the no tariff required under this act can result in  
          a cost shift to other customer classes  . 



          2)  Parameters for a pilot project  : Under the committee rules,  
          any bill that proposes the create of a pilot project must  
          contain the following specific requirements: 
           
                 (a)  The proposed pilot project's statement of purpose  
             that specifies the goals or objectives of the project.  

             (b)  Precise cost projections, where the funding for the  
             project will be derived, and methods by which savings, if  
             any, may be calculated. 
           
             (c)  A definitive mechanism by which the value and success,  
             if any, of the project may be quantified.  This mechanism  
             shall include specific numerical objectives that must be met  
             or exceeded if a project is to be judged successful. 

              (d)   A date by which the project will be completed and  
                evaluated. 

           (e)   Provisions for the submission of a report to this  
             committee evaluating the effectiveness of the project.

              (f)   A sunset date for the provisions creating the pilot  
                project.









                                                                  AB 1348
                                                                  Page  3

          The purpose of the pilot project created in this bill is not  
          clear and the bill does not contain provisions specifying how  
          the success of the project will be measured, a date by which the  
          project will be completed, a provision for submitting a report  
          to the committee, or a sunset date.  To comply with committee  
          rules, this bill should be amended to contain these provisions  . 


           REGISTERED SUPPORT / OPPOSITION  :   

           Support 
           
          Kyocera Solar, Inc.
          Planning and Conservation League
          Powerlight Solar Electric Systems
          Southern California Edison (SCE) (as amended)
          Vote Solar

           Opposition 
           
          Pacific Gas & Electric (PG&E)
          Sempra Energy
           
          Analysis Prepared by  :    Edward Randolph / U. & C. / (916)  
          319-2083